Saturday, 12 September 2015

The River Niger Bridge at Onitsha was constructed between 1964 &1965 by Dumez- a French Construction Company and cost £5 million

The River Niger Bridge at Onitsha was constructed between 1964 &1965 by Dumez a
French Construction company and cost £5 million that's about 150 Billion Naira then . and someone will tell us nigeria don't have money,

Related Posts:

0 comments:

Post a Comment